{"id":9675,"date":"2017-01-11T06:06:04","date_gmt":"2017-01-11T06:06:04","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=9675"},"modified":"2017-01-11T06:06:04","modified_gmt":"2017-01-11T06:06:04","slug":"mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/","title":{"rendered":"Mammoet has safely completed the load-out of the 14,273-ton Integrated Topside Module (ITM) in Indonesia"},"content":{"rendered":"<p><a href=\"http:\/\/www.mammoet.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Mammoet<\/a>, the global market leader in engineered heavy lifting and transport has safely completed the load-out of the 14,273-ton Integrated Topside Module (ITM) for the Jangkrik Floating Production Unit (FPU).<\/p>\n<blockquote>\n<h2>INSTALLATION OF INTEGRATED TOPSIDE MODULE IN ONE PIECE IS ANOTHER INDUSTRY FIRST AND A SIGNIFICANT TIMESAVER FOR FPU CONSTRUCTION.<\/h2>\n<\/blockquote>\n<p>Normally, the topside of an FPU is constructed with multiple modules placed individually and integrated on the hull of the vessel. In this unique project, the topside was fabricated and commissioned in one piece on shore, and moved in its entirety onto the hull. This drastically reduced integration time and improved safety.<\/p>\n<p>For this project, Mammoet deployed a hydraulic skidding system with built-in vertical jacks and installed it underneath the topside. By using the jacks, Mammoet lifted the topside off its temporary supports and performed a calibrated weighing. While supported by the jacks, the topside was skidded over nine skid beams from its construction area to the quayside to prepare for load-out. During the load-out, Mammoet\u2019s computerized ballast system, with a total capacity of 56,000m3\/hour, compensated for tidal differences and the weight of the topside and kept the hull perfectly level with the quayside. All the while, the vertical jacks compensated for any deflections of the ITM and the skid beams.<\/p>\n<p>By safely and smoothly performing this operation, Mammoet has begun a new era in which even bigger modules can be loaded onto floating hulls. Topsides can be fabricated and commissioned almost fully on land while hull construction is ongoing. This approach reduces integration activities to a minimum, and significantly shortens the overall construction schedule by months. With the innovative solutions of Mammoet, Jangkrik FPU\u2019s time-to-market is reduced and gas can flow earlier.<\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-9677\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2017\/01\/mammoet-jangkrik-1.png\" alt=\"mammoet-jangkrik-1\" width=\"1160\" height=\"628\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/01\/mammoet-jangkrik-1.png 1160w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/01\/mammoet-jangkrik-1-300x162.png 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/01\/mammoet-jangkrik-1-768x416.png 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/01\/mammoet-jangkrik-1-1024x554.png 1024w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/01\/mammoet-jangkrik-1-1080x585.png 1080w\" sizes=\"(max-width: 1160px) 100vw, 1160px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mammoet, the global market leader in engineered heavy lifting and transport has safely completed the load-out of the 14,273-ton Integrated Topside Module (ITM) for the Jangkrik Floating Production Unit (FPU). INSTALLATION OF INTEGRATED TOPSIDE MODULE IN ONE PIECE IS ANOTHER INDUSTRY FIRST AND A SIGNIFICANT TIMESAVER FOR FPU CONSTRUCTION. Normally, the topside of an FPU [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9676,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[2,4,10],"tags":[998],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mammoet has safely completed the load-out of the 14,273-ton Integrated Topside Module (ITM) in Indonesia - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mammoet has safely completed the load-out of the 14,273-ton Integrated Topside Module (ITM) in Indonesia - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"Mammoet, the global market leader in engineered heavy lifting and transport has safely completed the load-out of the 14,273-ton Integrated Topside Module (ITM) for the Jangkrik Floating Production Unit (FPU). INSTALLATION OF INTEGRATED TOPSIDE MODULE IN ONE PIECE IS ANOTHER INDUSTRY FIRST AND A SIGNIFICANT TIMESAVER FOR FPU CONSTRUCTION. Normally, the topside of an FPU [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2017-01-11T06:06:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/01\/mammoet-jangkrik-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1160\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/01\/mammoet-jangkrik-2.png\",\"width\":1160,\"height\":628},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/\",\"name\":\"Mammoet has safely completed the load-out of the 14,273-ton Integrated Topside Module (ITM) in Indonesia - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/#primaryimage\"},\"datePublished\":\"2017-01-11T06:06:04+00:00\",\"dateModified\":\"2017-01-11T06:06:04+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"Mammoet has safely completed the load-out of the 14,273-ton Integrated Topside Module (ITM) in Indonesia\",\"datePublished\":\"2017-01-11T06:06:04+00:00\",\"dateModified\":\"2017-01-11T06:06:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoe-has-safely-completed-the-load-out-of-the-14273-ton-integrated-topside-module-itm-for-the-jangkrik-floating-production-unit-in-indonesia\/#primaryimage\"},\"keywords\":\"Mammoet\",\"articleSection\":\"Constuction &amp; Business News,Energy News,Offshore News\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/9675"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=9675"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/9675\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/9676"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=9675"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=9675"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=9675"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}