{"id":7182,"date":"2016-09-28T14:05:17","date_gmt":"2016-09-28T14:05:17","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=7182"},"modified":"2016-09-28T14:05:17","modified_gmt":"2016-09-28T14:05:17","slug":"8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/","title":{"rendered":"$8.5 billion Sturgeon Refinery Construction in Alberta Canada 90% complete"},"content":{"rendered":"<p>Sturgeon County\u2019s biggest industrial project is now 90 per cent complete, says one of its proponents. Now comes the tough part.<\/p>\n<p>The <a href=\"http:\/\/www.stalbertgazette.com\/article\/Mammoth-project-is-90-per-cent-done-20160928\" target=\"_blank\" rel=\"noopener noreferrer\">St. Albert Gazette<\/a> toured the $8.5 billion Sturgeon Refinery last week for an update on the project\u2019s progress.<\/p>\n<div id=\"attachment_7186\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-7186\" loading=\"lazy\" class=\"wp-image-7186 size-full\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-3.jpg\" alt=\"Sturgeon Refinery-project-machine.market\" width=\"800\" height=\"533\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-3.jpg 800w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-3-300x200.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-3-768x512.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-7186\" class=\"wp-caption-text\">A view of Phase 1 of the NWR Sturgeon Refinery. The refinery construction project currently employs over 6,000 workers and Phase 1 of the site is expected to be completed by 2017. BRYAN YOUNG\/St. Albert Gazette<\/p><\/div>\n<p>Whereas the refinery was mostly pilings and foundations when the Gazette last visited two years ago, it\u2019s now something of a subdivision in steel.<\/p>\n<p>\u201cVisually, we\u2019re 90 per cent complete,\u201d said Doug Bertsch, tour guide and vice-president of regulatory and stakeholder affairs for <a href=\"https:\/\/nwrsturgeonrefinery.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">North West Redwater Partnership<\/a>, the group behind the refinery.<\/p>\n<p>\u201cThe second 90 per cent is still a ways to go.\u201d<\/p>\n<h4><b>Big metal city<\/b><\/h4>\n<p>The basic shape of the refinery is now mostly completed, Bertsch said. Residents shouldn\u2019t notice much change in the skyline in the months ahead, apart from a drop in the number of construction cranes (of which about 100 are now on site).<\/p>\n<p>Crews have been welding together house-sized masses of pipes, girders and machinery called modules over the last two years, stacking them together Lego-like to build the refinery. All but 24 of the project\u2019s 1,100 modules are now in place or on site.<\/p>\n<p><iframe loading=\"lazy\" width=\"1080\" height=\"608\" src=\"https:\/\/www.youtube.com\/embed\/XYws0ZwsrE8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<p>The refinery is now divided into several blocks, each of which contains the equipment for a different part of the refining process. Linking them all is a spine of shiny steel pipes that zigzags through the site from regional pipelines to the south to the storage tanks up north.<\/p>\n<p>Sausage-shaped reactors now stretch 100 meters tall from within boxy tangles of girders and pipes, surrounded by dirt roads complete with traffic signs. The big concrete UFO landing pads the Gazette saw on its last visit now support about 20 chocolate-brown storage tanks, each the size of a small office building and ringed with curved staircases.<\/p>\n<div id=\"attachment_7184\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-7184\" loading=\"lazy\" class=\"wp-image-7184 size-full\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-2.jpg\" alt=\"Sturgeon Refinery-project-machine.market-2\" width=\"800\" height=\"476\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-2.jpg 800w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-2-300x179.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-2-768x457.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-7184\" class=\"wp-caption-text\">Surveyors are seen working at the NWR Sturgeon Refinery on Sept. 21. The refinery construction project currently employs over 6,000 workers and Phase 1 of the site is expected to be completed by 2017. BRYAN YOUNG\/St. Albert Gazette<\/p><\/div>\n<p>There are about 6,000 workers on site during the day right now and about 1,000 at night, Bertsch said. About 70 per cent of them take the bus to work, which drives around the site and drops them off at whatever part of the plant they\u2019re working on. There are so many people on site at any one time that they have to ban cars from certain areas during the day for safety reasons.<\/p>\n<p>The composition of that workforce has shifted since the start of construction, Bertsch said. Whereas early days saw more civil contractors and carpenters to build concrete forms, now you have more ironworkers to weld pipes and modules together. Electricians and insulators will be in demand as the refinery moves into its final stretch.<\/p>\n<h4><b>Next steps<\/b><\/h4>\n<p>If all the work so far was like building the outside of a house, the next phase is about the insides, and it\u2019s the toughest part, Bertsch said.<\/p>\n<p>Crews now have to wrap solid insulation and heating wire around hundreds of kilometres of pipe so they can heat the bitumen and keep it fluid, he said \u2013 bitumen is normally as thick as cold peanut butter. They also have to install thousands of sensors and remote triggers to control the refinery, each of which must be tested individually.<\/p>\n<div id=\"attachment_7185\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-7185\" loading=\"lazy\" class=\"wp-image-7185 size-full\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-1.jpg\" alt=\"Sturgeon Refinery-project-machine.market-1\" width=\"800\" height=\"529\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-1.jpg 800w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-1-300x198.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-1-768x508.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-7185\" class=\"wp-caption-text\">A view of Phase 1 of the NWR Sturgeon Refinery is seen on Sept. 21. A total of 300 workers will be employed by the refinery when it is completed in 2017. BRYAN YOUNG\/St. Albert Gazette<\/p><\/div>\n<p>Once they flush any explosive gas out of the pipes, crews should be ready to start refining bitumen by late next year, Bertsch said. When the refinery becomes operational, the workforce will drop to about 300 permanent employees plus a few hundred contractors for maintenance.<\/p>\n<p>North West will have paid out about $2.5 billion in wages at the end of this first phase of the refinery, most of which will have been spent in the Edmonton region, Bertsch said. The refinery itself should produce about $15 million a year in property taxes for Sturgeon County when complete. The refinery\u2019s recycling efforts (which have diverted about 98 per cent of its construction waste from the landfill) raised about $100,000 last year for charities such as the Sturgeon Foundation.<\/p>\n<p>The company has yet to decide if it will build the next two phases of the project.<\/p>\n<p>By: <a href=\"mailto:kma@stalbert.greatwest.ca\">Kevin Ma<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sturgeon County\u2019s biggest industrial project is now 90 per cent complete, says one of its proponents. Now comes the tough part. The St. Albert Gazette toured the $8.5 billion Sturgeon Refinery last week for an update on the project\u2019s progress. Whereas the refinery was mostly pilings and foundations when the Gazette last visited two years [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7187,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[2,3,4,5,12],"tags":[1422],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>$8.5 billion Sturgeon Refinery Construction in Alberta Canada 90% complete - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"$8.5 billion Sturgeon Refinery Construction in Alberta Canada 90% complete - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"Sturgeon County\u2019s biggest industrial project is now 90 per cent complete, says one of its proponents. Now comes the tough part. The St. Albert Gazette toured the $8.5 billion Sturgeon Refinery last week for an update on the project\u2019s progress. Whereas the refinery was mostly pilings and foundations when the Gazette last visited two years [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2016-09-28T14:05:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-3-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"426\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/09\/Sturgeon-Refinery-project-machine.market-3-1.jpg\",\"width\":800,\"height\":426,\"caption\":\"Construction workers are hoisted into the air by a crane at the NWR Sturgeon Refinery on Sept. 21. The refinery construction project is 90 per cent complete. BRYAN YOUNG\/St. Albert Gazette\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/\",\"name\":\"$8.5 billion Sturgeon Refinery Construction in Alberta Canada 90% complete - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/#primaryimage\"},\"datePublished\":\"2016-09-28T14:05:17+00:00\",\"dateModified\":\"2016-09-28T14:05:17+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"$8.5 billion Sturgeon Refinery Construction in Alberta Canada 90% complete\",\"datePublished\":\"2016-09-28T14:05:17+00:00\",\"dateModified\":\"2016-09-28T14:05:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/8-5-billion-sturgeon-refinery-in-alberta-canada-90-complete\/#primaryimage\"},\"keywords\":\"Sturgeon Refinery Construction\",\"articleSection\":\"Constuction &amp; Business News,Crane &amp; Lifting News,Energy News,Equipment &amp; Construction Videos,Workforce News\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/7182"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=7182"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/7182\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/7187"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=7182"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=7182"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=7182"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}