{"id":6189,"date":"2016-08-30T14:06:46","date_gmt":"2016-08-30T14:06:46","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=6189"},"modified":"2016-08-30T14:06:46","modified_gmt":"2016-08-30T14:06:46","slug":"johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/","title":{"rendered":"Johnson Crane Hire continues to build up an impressive track record on South Africa\u2019s wind farm projects."},"content":{"rendered":"<p>Having undertaken many successful lifts for both the construction and maintenance of wind farm projects in the country, the company was recently appointed by Azari Wind (Azari) as cranage contractor on Enel Green Power\u2019s 111 MW Gibson Bay Wind Farm in the Eastern Cape, South Africa. Azari is the crane and installation contractor appointed by Nordex Energy South Africa (Nordex), the EPC contractor on this \u20ac190-million project.<\/p>\n<div id=\"attachment_6198\" style=\"width: 778px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-6198\" loading=\"lazy\" class=\"wp-image-6198 size-full\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-9.jpg\" alt=\"johnson-crane-hire-liebherr-crane-9\" width=\"768\" height=\"1024\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-9.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-9-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><p id=\"caption-attachment-6198\" class=\"wp-caption-text\">Lifting the tower section<\/p><\/div>\n<p><a href=\"http:\/\/www.jch.co.za\/\" target=\"_blank\" rel=\"noopener noreferrer\">Johnson Crane Hire<\/a>\u2019s Brandon Grange considers this contract to be a significant milestone for the company in its growing reference in wind farm projects.<\/p>\n<p>Before being awarded the contract, Johnson Crane Hire underwent a two day internal audit by Nordex and Azari. \u201cOur compliance with ISO 9001 certification standards played a very big role in us being awarded this contract,\u201d he says.<\/p>\n<div id=\"attachment_6197\" style=\"width: 778px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-6197\" loading=\"lazy\" class=\"wp-image-6197 size-full\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-8.jpg\" alt=\"johnson-crane-hire-liebherr-crane-8\" width=\"768\" height=\"1024\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-8.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-8-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><p id=\"caption-attachment-6197\" class=\"wp-caption-text\">Tower section installation underway.<\/p><\/div>\n<p>\u201cOur working policies were put to the test. Nordex and Azari wanted to ensure that we comply with their exacting standards in every way possible, including being in line with Azari\u2019s ISO 9001, ISO 14001 and OHSAS 18001 requirements. As a major player in international wind farm projects, we knew that their approval of our processes would only further cement our progress in this specialised heavy lifting market,\u201d Grange says.<\/p>\n<div id=\"attachment_6195\" style=\"width: 778px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-6195\" loading=\"lazy\" class=\"wp-image-6195 size-full\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-7.jpg\" alt=\"johnson-crane-hire-liebherr-crane-7\" width=\"768\" height=\"1024\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-7.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-7-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><p id=\"caption-attachment-6195\" class=\"wp-caption-text\">Installation of the nacelle.<\/p><\/div>\n<p>The lifts started early in May, following a three month preparation period that included the involvement of all of the engineers working on the project. Here, the details of the lift including assessments of the wind speeds and ground-pressure bearings, were finalized.<\/p>\n<div id=\"attachment_6190\" style=\"width: 778px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-6190\" loading=\"lazy\" class=\"wp-image-6190 size-full\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane.jpg\" alt=\"johnson-crane-hire-liebherr-crane\" width=\"768\" height=\"576\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-300x225.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-510x382.jpg 510w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><p id=\"caption-attachment-6190\" class=\"wp-caption-text\">Lifting the blade.<\/p><\/div>\n<p>\u201cEvery site comes with its own very complex set of challenges which is why we spend so much time preparing for each lift. It is one of the key differentiators Johnson Crane Hire brings to this industry,\u201d says Grange.<\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-6193\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-4.jpg\" alt=\"johnson-crane-hire-liebherr-crane-4\" width=\"768\" height=\"1024\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-4.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-4-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>Over a five month period, Johnson Crane Hire will lift the various components of the 37 wind generators making up this wind farm. Having already supplied lifting services for about 80 wind turbines, Johnson Crane Hire has a solid understanding of the complexities of these super lifts.<\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-6191\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-1.jpg\" alt=\"johnson-crane-hire-liebherr-crane-1\" width=\"768\" height=\"1024\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-1.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-1-225x300.jpg 225w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>The lifts for each wind turbine include four tower sections (50 to 60 tons each), a nacelle (55 tons), drive train (62.3 tons), hub (35 tons) and three blades (11.2 tons and 57 metres in length each).<\/p>\n<p>Johnson Crane Hire undertook the lifts in accordance with Nordex and Azari\u2019s predetermined schedule, and while all components had to be handled with extreme care, Grange says the enormous blades are extremely sensitive. A damaged component could delay the successful delivery of the project and impact on its cost.<\/p>\n<p>One of the challenges is the very windy conditions in which the lifts are being undertaken. This project is situated close to the coast and, as such, the construction site experiences significant wind speeds. At about 06h00, wind speeds range from between three to five metres per second and up to nine metres per second by midday. By the time Johnson Crane Hire lifts the hub and blades, wind speeds could have reached 15 metres per second or more resulting in unwanted difficulties.<\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-6194\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-5.jpg\" alt=\"johnson-crane-hire-liebherr-crane-5\" width=\"768\" height=\"576\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-5.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-5-300x225.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-5-510x382.jpg 510w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/p>\n<p>This is the first time that Johnson Crane Hire will be undertaking tandem lifts for the blades. On earlier projects, these were all done in single lifts.<\/p>\n<p>He says that the professional team considers the extra crane a major boon in areas with high wind speeds where lifting schedules are accelerated as it does save costs. \u201cThose extra hours saved make all the difference,\u201d says Grange.<\/p>\n<p>Again, this lifting project will feature a strong Liebherr fleet of cranes. One of Johnson Crane Hire\u2019s competitive edges is its massive fleet of new cranes from this German original equipment manufacturer.<\/p>\n<p>\u201cNot only do they design and manufacture the best cranes on the market, we receive excellent back-up service from them,\u201d he says.<\/p>\n<p>On this project, the lifting specialist is using an<a href=\"https:\/\/www.liebherr.com\/en\/deu\/products\/mobile-and-crawler-cranes\/crawler-cranes\/lr-crawler-cranes\/lr-crawler-cranes.html\" target=\"_blank\" rel=\"noopener noreferrer\"> Liebherr<\/a>\u00a0750-ton\u00a0<a href=\"https:\/\/www.liebherr.com\/en\/afg\/products\/mobile-and-crawler-cranes\/mobile-cranes\/lg-lattice-mast-cranes\/details\/lg1750.html\" target=\"_blank\" rel=\"noopener noreferrer\">LG 1750<\/a>\u00a0crawler crane fitted with 245 t of counterweights. Once the hub is in place, this lead crane is joined by an <a href=\"https:\/\/www.liebherr.com\/en\/deu\/products\/mobile-and-crawler-cranes\/mobile-cranes\/ltm-mobile-cranes\/ltm-mobile-cranes.html\" target=\"_blank\" rel=\"noopener noreferrer\">Liebherr<\/a>\u00a0400-ton\u00a0<a href=\"https:\/\/www.liebherr.com\/en\/deu\/products\/mobile-and-crawler-cranes\/mobile-cranes\/ltm-mobile-cranes\/details\/ltm140071.html\" target=\"_blank\" rel=\"noopener noreferrer\">LTM 1400-7.1<\/a>\u00a0mobile crane\u00a0to help lift the blades. The LTM 1400-7.1 is fitted with a 42 metre Fixed Fly extension to boost its 60 metre reach.<\/p>\n<p>One of the company\u2019s ongoing success stories is its skilled crane operators. The LG 1750 and LTM 1400-7.1 will be operated by Johnson Crane Hire personnel with a combined experience of almost 40 years in super lifts.<\/p>\n<p>They are joined by Johnson Crane Hire\u2019s experienced crane crew. \u201cMembers of these teams are extremely knowledgeable about both the machines and the environments in which they are performing. Their first consideration is safety, and they will never allow a lift to proceed unless this mandate has been met,\u201d Grange tells <em>Plant Equipment &amp; Hire<\/em>.<\/p>\n<p>The cranes are kept in immaculate condition by Johnson Crane Hire\u2019s facility in Cape Town and national workshop. They are serviced every 500 hours. At these intervals, the booms and ropes are greased and the safe-load indicators on all of its cranes calibrated.<\/p>\n<p>The LTM 1400-7.1 is also used to assemble and erect the LG 1750. For the stripping and installation of the cranes, Johnson Crane Hire is using a <a href=\"https:\/\/www.liebherr.com\/en\/pyf\/products\/mobile-and-crawler-cranes\/mobile-cranes\/mobile-crane-technology\/mobile-crane-technology.html\" target=\"_blank\" rel=\"noopener noreferrer\">Liebherr<\/a> <a href=\"https:\/\/www.liebherr.com\/en\/pyf\/products\/mobile-and-crawler-cranes\/mobile-cranes\/ltm-mobile-cranes\/details\/ltm109551.html\" target=\"_blank\" rel=\"noopener noreferrer\">LTM 1095-5.1<\/a> crane.<\/p>\n<p>Depending on the terrain, it takes between one to three days to relocate the cranes to the different pads where the lifts are being undertaken in line with Azari\u2019s policy on this project which is to minimise transport and maximise lifting movements on site. This project site spans at least four private farms, with each pad located about 400 metre from the next.<\/p>\n<p>The LG 1750 was bought specifically by Johnson Crane Hire for lifting wind turbine components, and it has been involved in many of the these projects under the South African government\u2019s very successful Renewable Energy Independent Power Producer Procurement (REIPPP) programme.<\/p>\n<p>\u201cAn advantage offered by this machine is that it is narrow and travels on tyres, as opposed to tracks. It is also fitted with folding outriggers, improving its mobility on roads,\u201d says Grange.<\/p>\n<p>All of the other cranes were mobilised from Johnson Crane Hire\u2019s yard in Johannesburg, travelling between 50 km to 60 km an hour to the site. One of the biggest challenges here was working around the embargoes during the March\/April holiday period.<\/p>\n<p>Johnson Crane Hire\u2019s knowledge also helped save costs on the project by eliminating the use of crusher run for the construction of some of the 37 auxiliary pads for the LG 1750. Here, excavation and compaction methods were deployed to achieve the 20 ton per square metre ground-pressure bearings needed to support the lead crane, saving Nordex and Azari in costs associated with backfilling with aggregates.<\/p>\n<p>This was the case on four of these 12 metre by 15 metre pads which were located on steep inclines, and needed to be aligned with the others.<\/p>\n<p>Meanwhile, Johnson Crane Hire was awarded a contract for two cranes by Absolute Rigging, which has been sub-contracted by Nordex and is under Azari\u2019s installation management.<\/p>\n<p>Johnson Crane Hire\u2019s Liebherr LTM 1160-2 and LTM 1095-5.1 place the various components in the storage areas when they arrive on site. They are deployed again when they lift and place these components in the laydown areas around the LG 1750 before it starts lifting. They are transported by two multi-axle trailers to the various pads. The entire process is co-ordinated with Azari\u2019s lifting schedule.<\/p>\n<p>Increased local participation in government\u2019s REIPPP programme is growing. Johnson Crane Hire is proving that it is able to compete against the best the world has to offer when it comes to complex super lifts!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Having undertaken many successful lifts for both the construction and maintenance of wind farm projects in the country, the company was recently appointed by Azari Wind (Azari) as cranage contractor on Enel Green Power\u2019s 111 MW Gibson Bay Wind Farm in the Eastern Cape, South Africa. Azari is the crane and installation contractor appointed by [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6196,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[3,4,6,8],"tags":[385,787,873],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Johnson Crane Hire continues to build up an impressive track record on South Africa\u2019s wind farm projects. - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Johnson Crane Hire continues to build up an impressive track record on South Africa\u2019s wind farm projects. - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"Having undertaken many successful lifts for both the construction and maintenance of wind farm projects in the country, the company was recently appointed by Azari Wind (Azari) as cranage contractor on Enel Green Power\u2019s 111 MW Gibson Bay Wind Farm in the Eastern Cape, South Africa. Azari is the crane and installation contractor appointed by [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2016-08-30T14:06:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-6.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/johnson-crane-hire-liebherr-crane-6.jpg\",\"width\":768,\"height\":576,\"caption\":\"Lifting the blade.\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/\",\"name\":\"Johnson Crane Hire continues to build up an impressive track record on South Africa\\u2019s wind farm projects. - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/#primaryimage\"},\"datePublished\":\"2016-08-30T14:06:46+00:00\",\"dateModified\":\"2016-08-30T14:06:46+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"Johnson Crane Hire continues to build up an impressive track record on South Africa\\u2019s wind farm projects.\",\"datePublished\":\"2016-08-30T14:06:46+00:00\",\"dateModified\":\"2016-08-30T14:06:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/johnson-crane-hire-continues-to-build-up-an-impressive-track-record-on-south-africas-wind-farm-projects\/#primaryimage\"},\"keywords\":\"crawler crane,Johnson Crane Hire,Liebherr 750-ton LG 1750\",\"articleSection\":\"Crane &amp; Lifting News,Energy News,Equipment Rental News,Manufacturer News\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/6189"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=6189"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/6189\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/6196"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=6189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=6189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=6189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}