{"id":5420,"date":"2016-08-02T17:39:56","date_gmt":"2016-08-02T17:39:56","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=5420"},"modified":"2016-08-02T17:39:56","modified_gmt":"2016-08-02T17:39:56","slug":"bauer-involved-in-constructing-a-tunnel-under-the-suez-canal","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/","title":{"rendered":"Bauer Involved In Constructing A Tunnel Under The Suez Canal"},"content":{"rendered":"<p><strong>Ismailia, Egypt<\/strong> &#8211; The \u201cNew Suez Canal\u201d was officially opened in August 2015 during a grand ceremony. The waterway, which has great significance for world trade, had been widened at certain points and expanded. It connects the Mediterranean Sea with the Red Sea and is the shortest sea route from Asia to Europe. The reopening of the Suez Canal does not mean that all construction work on the waterway has been completed though. For instance, a new road tunnel up to 82 feet below the bed of the Suez Canal and 230 feet below the ground level is currently being built north of the city Ismailia. BAUER EGYPT S.A.E., the Egyptian subsidiary of <a href=\"http:\/\/www.bauer.de\/bst\/\" target=\"_blank\" rel=\"noopener noreferrer\">BAUER Spezialtiefbau GmbH<\/a>, has been carrying out the necessary specialist foundation engineering works as subcontractor for the joint venture between Egypt based companies <a href=\"http:\/\/www.petrojet.com.eg\/#\" target=\"_blank\" rel=\"noopener noreferrer\">PETROJET<\/a> and <a href=\"http:\/\/www.concord-ec.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Concord for Engineering &amp; Contracting<\/a> and on behalf of the Egyptian client Engineering Authority Armed-Forces Military Engineers Administration since May 2015.<\/p>\n<p>For the ventilation system Bauer is constructing four shafts with a depth of up to 278 feet and a diameter of 68 feet using diaphragm wall technology; additionally, Bauer is constructing a diaphragm wall around 27 acres in size and up to 164 feet deep to serve as start and target shafts for the tunnel boring machine. The scope of works also includes the construction of a soft gel blanket covering 5.25 acres and the installation of 150 temporary anchors. Among other equipment, a BAUER MC 128 and an <a href=\"http:\/\/www.bauerpileco.com\/en\/products\/mc_cranes\/mc_96\/\" target=\"_blank\" rel=\"noopener noreferrer\">MC 96<\/a> duty-cycle crane, both equipped with a BC 40 cutter, are being used along with two <a href=\"http:\/\/www.bauerpileco.com\/en\/products\/bauer_bg\/\" target=\"_blank\" rel=\"noopener noreferrer\">BAUER<\/a> <a href=\"http:\/\/www.bauerpileco.com\/en\/products\/bauer_bg\/bg_premium_line\/bg_28_bs_80\/\" target=\"_blank\" rel=\"noopener noreferrer\">BG 28<\/a> drilling rigs.<\/p>\n<p><a href=\"http:\/\/www.baueregypt.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">BAUER EGYPT S.A.E.<\/a> expects to be finished with its specialist foundation engineering works in July 2016. Once it\u2019s completed in 2018, the twin-tube Ismailia road tunnel including the tunnel approaches will stretch approximately 4 miles underneath the Suez Canal.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ismailia, Egypt &#8211; The \u201cNew Suez Canal\u201d was officially opened in August 2015 during a grand ceremony. The waterway, which has great significance for world trade, had been widened at certain points and expanded. It connects the Mediterranean Sea with the Red Sea and is the shortest sea route from Asia to Europe. The reopening [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5422,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[2,8],"tags":[161,481,488],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Bauer Involved In Constructing A Tunnel Under The Suez Canal - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bauer Involved In Constructing A Tunnel Under The Suez Canal - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"Ismailia, Egypt &#8211; The \u201cNew Suez Canal\u201d was officially opened in August 2015 during a grand ceremony. The waterway, which has great significance for world trade, had been widened at certain points and expanded. It connects the Mediterranean Sea with the Red Sea and is the shortest sea route from Asia to Europe. The reopening [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2016-08-02T17:39:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/Ismailia-Tunnel-Small-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"615\" \/>\n\t<meta property=\"og:image:height\" content=\"404\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/08\/Ismailia-Tunnel-Small-1.jpg\",\"width\":615,\"height\":404},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/\",\"name\":\"Bauer Involved In Constructing A Tunnel Under The Suez Canal - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/#primaryimage\"},\"datePublished\":\"2016-08-02T17:39:56+00:00\",\"dateModified\":\"2016-08-02T17:39:56+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"Bauer Involved In Constructing A Tunnel Under The Suez Canal\",\"datePublished\":\"2016-08-02T17:39:56+00:00\",\"dateModified\":\"2016-08-02T17:39:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/bauer-involved-in-constructing-a-tunnel-under-the-suez-canal\/#primaryimage\"},\"keywords\":\"BAUER Spezialtiefbau GmbH,drilling rigs,duty-cycle crane\",\"articleSection\":\"Constuction &amp; Business News,Manufacturer News\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/5420"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=5420"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/5420\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/5422"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=5420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=5420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=5420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}