{"id":4197,"date":"2016-06-10T14:25:49","date_gmt":"2016-06-10T14:25:49","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=4197"},"modified":"2016-06-10T14:25:49","modified_gmt":"2016-06-10T14:25:49","slug":"mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/","title":{"rendered":"Mammoet is prepping 5,000-ton capacity crane for Module Intergration in Brazil"},"content":{"rendered":"<p><a href=\"http:\/\/www.mammoet.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Mammoet<\/a> has started preparations for lifting modules onto the P-76 Floating Production Storage and Offloading (FPSO) vessels hull in Brazil for the Consortium CTTP76.<\/p>\n<blockquote>\n<h2>MAMMOET IN FULL PREPARATION FOR P-76 FPSO MODULE INTEGRATION IN PONTAL DO PARANA (BRAZIL).<\/h2>\n<\/blockquote>\n<p>Integration of the modules is one of the most critical operations during the construction of an FPSO. Due to the scale of the modules installed on these vast floating production storage and offloading units, a high capacity crane is required. Mammoet mobilized one of their fleet of <a href=\"http:\/\/www.mammoet.com\/siteassets\/equipment\/cranes\/ring-cranes\/ptc-200-ds\/datasheet-ptc-200-ds.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">PTC 200-DS,<\/a> a 5,000-ton capacity crane, from the USA just 6 weeks after the contract was signed.<\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-4199\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration2.jpg\" alt=\"mammoet-p-76-fpso-integration2\" width=\"1160\" height=\"628\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration2.jpg 1160w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration2-300x162.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration2-768x416.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration2-1024x554.jpg 1024w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration2-1080x585.jpg 1080w\" sizes=\"(max-width: 1160px) 100vw, 1160px\" \/><\/p>\n<p>The FPSO module integration project was agreed between Mammoet Brazil and CTTP76 for weighing, transporting and lifting of 20 modules ranging up to nearly 2,000 metric tons. All the modules are currently located at the UOT (Unidade Offshore Techint) integration yard awaiting the arrival of the FPSO hull which is currently at the Enseada Inhauma shipyard in Rio de Janeiro.<\/p>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-4200\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration1.jpg\" alt=\"mammoet-p-76-fpso-integration1\" width=\"1160\" height=\"628\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration1.jpg 1160w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration1-300x162.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration1-768x416.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration1-1024x554.jpg 1024w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration1-1080x585.jpg 1080w\" sizes=\"(max-width: 1160px) 100vw, 1160px\" \/><\/p>\n<p>Mammoet has a 15-year track record of executing complex projects like this in Brazil. Amongst other such projects, the company has performed the integration of modules on both the P58 and P63 FPSOs in Brazil.\u00a0 The PTC 200-DS ring crane was identified as the best option for the P-76 project, because it combines extreme lifting capacity with a long reach, small footprint, maneuverability and quick mobilization.<\/p>\n<p>The assembly of the crane has already started, and it is predicted that the P-76 module integration will take place during the second half of\u00a0 this year at the UOT yard, in the city of Pontal do Paran\u00e1, Paran\u00e1 State, Brazil.<\/p>\n<p><iframe loading=\"lazy\" width=\"1080\" height=\"608\" src=\"https:\/\/www.youtube.com\/embed\/CAwlPRXqX0M?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mammoet has started preparations for lifting modules onto the P-76 Floating Production Storage and Offloading (FPSO) vessels hull in Brazil for the Consortium CTTP76. MAMMOET IN FULL PREPARATION FOR P-76 FPSO MODULE INTEGRATION IN PONTAL DO PARANA (BRAZIL). Integration of the modules is one of the most critical operations during the construction of an FPSO. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":4198,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[3,5],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mammoet is prepping 5,000-ton capacity crane for Module Intergration in Brazil - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mammoet is prepping 5,000-ton capacity crane for Module Intergration in Brazil - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"Mammoet has started preparations for lifting modules onto the P-76 Floating Production Storage and Offloading (FPSO) vessels hull in Brazil for the Consortium CTTP76. MAMMOET IN FULL PREPARATION FOR P-76 FPSO MODULE INTEGRATION IN PONTAL DO PARANA (BRAZIL). Integration of the modules is one of the most critical operations during the construction of an FPSO. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2016-06-10T14:25:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1160\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/06\/mammoet-p-76-fpso-integration3.jpg\",\"width\":1160,\"height\":628},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/\",\"name\":\"Mammoet is prepping 5,000-ton capacity crane for Module Intergration in Brazil - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/#primaryimage\"},\"datePublished\":\"2016-06-10T14:25:49+00:00\",\"dateModified\":\"2016-06-10T14:25:49+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"Mammoet is prepping 5,000-ton capacity crane for Module Intergration in Brazil\",\"datePublished\":\"2016-06-10T14:25:49+00:00\",\"dateModified\":\"2016-06-10T14:25:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mammoet-is-prepping-5000-ton-capacity-crane-for-module-intergation-in-brazil\/#primaryimage\"},\"articleSection\":\"Crane &amp; Lifting News,Equipment &amp; Construction Videos\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/4197"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=4197"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/4197\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/4198"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=4197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=4197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=4197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}