{"id":2627,"date":"2016-05-11T16:28:15","date_gmt":"2016-05-11T16:28:15","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=2627"},"modified":"2016-05-11T16:28:15","modified_gmt":"2016-05-11T16:28:15","slug":"kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/","title":{"rendered":"Kraemer North America bridge work engineers credited with accelerating construction."},"content":{"rendered":"<p class=\"Text_Body\">Minnesota &#8211; The historic bridge carrying Franklin Avenue over the Mississippi River is getting a makeover in an innovative way meant to lessen construction time. \u00a0&#8220;Pouring concrete on the bridge, according to Paul Backer, a county project engineer would have closed the bridge for two construction seasons.&#8221;<\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-2632 size-medium\" src=\"http:\/\/minutes.machine.market\/wp-content\/uploads\/2016\/05\/minny-bridge-5-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/05\/minny-bridge-5-300x225.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/05\/minny-bridge-5.jpg 470w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p class=\"Text_Body\">Instead, contractor <a href=\"http:\/\/www.kraemerna.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">Kraemer North America<\/a> has been precasting 366 panels of the new concrete bridge deck just upstream at Bohemian Flats. From there, they\u2019ll be barged to the bridge and hoisted to the deck by cranes. The cranes are also being used to lower 25-ton sections of the old 1970s bridge deck to barges below, to be ferried upriver and trucked to a crushing yard.<\/p>\n<p class=\"Text_Body\">The 45 cross beams of reinforced concrete that support the deck will also be exchanged. The newly cast beams will feature scrolled ends that mimic the bridge\u2019s original 1923 design. New side railings in the original design also will be installed, along with reproductions of the original ornamental streetlights.<\/p>\n<blockquote>\n<div id=\"zone-1-block-5-sideways-inline-body\" class=\"sideways-ad ad-mod dfp-ad-container\" data-appear-top-offset=\"300\">\u201cI give the engineers the credit here,\u201d said County Commissioner Peter McLaughlin, who said the short but intense closing was chosen after consulting with nearby businesses and residents.<\/div>\n<div class=\"sideways-ad ad-mod dfp-ad-container\" data-appear-top-offset=\"300\">\n<div style=\"width: 2010px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" class=\"mfp-img is-visible\" src=\"http:\/\/stmedia.startribune.com\/images\/2000*1225\/1462934163_10069521+1frank051116.JPG\" alt=\"Construction workers help guide a 12-foot-by-28-foot roadway panel down from the nearby Franklin Avenue Bridge after the concrete slab was sawed out of the bridge road on Tuesday.\" width=\"2000\" height=\"1225\" \/><p class=\"wp-caption-text\">Construction workers help guide a 12-foot-by-28-foot roadway panel down from the nearby Franklin Avenue Bridge after the concrete slab was sawed out of the bridge road on Tuesday.<\/p><\/div>\n<\/div>\n<\/blockquote>\n<div class=\"sideways-ad ad-mod dfp-ad-container\" data-appear-top-offset=\"300\"><\/div>\n<div class=\"sideways-ad ad-mod dfp-ad-container\" data-appear-top-offset=\"300\"><strong>Accelerated construction<\/strong><\/div>\n<div class=\"sideways-ad ad-mod dfp-ad-container\" data-appear-top-offset=\"300\">\n<p class=\"Text_Body\">The bridge, known officially as the Cappelen Memorial Bridge, joins others in the metro built with techniques that accelerate construction.\u00a0The $51 million cost of the Franklin bridge project is comparable to what it would be under a more traditional approach, Backer said.<\/p>\n<p class=\"Text_Body\">Innovative construction methods fit with the Franklin Avenue bridge\u2019s history. It\u2019s one of a series of bridges built by Minneapolis from 1914 to 1929 that attracted engineers from around the world. The five-span bridge stood out for its 400-foot central arch, the longest reinforced concrete arch in the world when it opened in 1923, something that later made barge traffic easier.<\/p>\n<p class=\"Text_Body\">The current rehab aims to restore some grandeur while complying with modern standards such as safety and accessibility, said Kristen Zschomler of MnDOT, who worked with the county to comply with federal standards for historic properties. The bridge is a designated local landmark and on the National Register of Historic Places.<\/p>\n<div style=\"width: 2009px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" class=\"mfp-img is-visible\" src=\"http:\/\/stmedia.startribune.com\/images\/2000*1396\/1462934222_10069521+3frank051116.JPG\" alt=\"Construction workers help guide a 12-foot-by-28-foot roadway panel down from the nearby Franklin Avenue Bridge after the concrete slab was sawed out of the bridge roadway and removed via crane Tuesday.\" width=\"1999\" height=\"1396\" \/><p class=\"wp-caption-text\">Construction workers help guide a 12-foot-by-28-foot roadway panel down from the nearby Franklin Avenue Bridge after the concrete slab was sawed out of the bridge roadway and removed via crane Tuesday.<\/p><\/div>\n<div style=\"width: 2010px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" class=\"mfp-img is-visible\" src=\"http:\/\/stmedia.startribune.com\/images\/2000*1334\/1462934222_10069521+4frank051116.JPG\" alt=\"A giant saw that can be remotely operated cuts through 12 plus-inch concrete roadway on the Franklin Avenue Bridge on Tuesday.\" width=\"2000\" height=\"1334\" \/><p class=\"wp-caption-text\">A giant saw that can be remotely operated cuts through 12 plus-inch concrete roadway on the Franklin Avenue Bridge on Tuesday.<\/p><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Minnesota &#8211; The historic bridge carrying Franklin Avenue over the Mississippi River is getting a makeover in an innovative way meant to lessen construction time. \u00a0&#8220;Pouring concrete on the bridge, according to Paul Backer, a county project engineer would have closed the bridge for two construction seasons.&#8221; Instead, contractor Kraemer North America has been precasting [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2628,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[2,3],"tags":[205,387,837],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Kraemer North America bridge work engineers credited with accelerating construction. - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kraemer North America bridge work engineers credited with accelerating construction. - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"Minnesota &#8211; The historic bridge carrying Franklin Avenue over the Mississippi River is getting a makeover in an innovative way meant to lessen construction time. \u00a0&#8220;Pouring concrete on the bridge, according to Paul Backer, a county project engineer would have closed the bridge for two construction seasons.&#8221; Instead, contractor Kraemer North America has been precasting [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2016-05-11T16:28:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/05\/minny-bridge-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1457\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/05\/minny-bridge-1.jpg\",\"width\":2000,\"height\":1457,\"caption\":\"Construction workers help guide a 12-foot-by-28-foot roadway panel down from the nearby Franklin Avenue Bridge after the concrete slab was sawed out of the bridge roadway Tuesday, May 10, 2016, in Minneapolis MN. The piece weighed about 25 plus tons or about 13 times what a typical motor vehicle weighs. Construction on the bridge, which began with bridge undercarriage repair in February of 2015, is expected to be completed by June 2017. The bridge will reopen for traffic after Labor Day.\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/\",\"name\":\"Kraemer North America bridge work engineers credited with accelerating construction. - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/#primaryimage\"},\"datePublished\":\"2016-05-11T16:28:15+00:00\",\"dateModified\":\"2016-05-11T16:28:15+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"Kraemer North America bridge work engineers credited with accelerating construction.\",\"datePublished\":\"2016-05-11T16:28:15+00:00\",\"dateModified\":\"2016-05-11T16:28:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/kraemer-north-america-bridge-work-engineers-credited-with-accelerating-construction\/#primaryimage\"},\"keywords\":\"Bridge construction,crawler cranes,Kraemer North America\",\"articleSection\":\"Constuction &amp; Business News,Crane &amp; Lifting News\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/2627"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=2627"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/2627\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/2628"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=2627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=2627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=2627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}