{"id":1441,"date":"2016-04-25T14:56:12","date_gmt":"2016-04-25T14:56:12","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=1441"},"modified":"2016-04-25T14:56:12","modified_gmt":"2016-04-25T14:56:12","slug":"construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/","title":{"rendered":"Construction In Full Swing at Canada&#8217;s tallest building outside of a downtown area"},"content":{"rendered":"<p>One of the largest excavation pits in the Greater Toronto Area is now buzzing with activity as work is under way to build two condominium towers\u2014one of them the tallest building in Canada outside of a downtown area\u2014and the sweeping podium they will rise from. <a href=\"http:\/\/urbantoronto.ca\/link.php?source=database&amp;url=urbantoronto.ca\/database\/projects\/eau-du-soleil-condos\" target=\"_blank\" rel=\"noopener noreferrer\">Eau du Soleil<\/a>,\u00a0being developed by <a href=\"http:\/\/urbantoronto.ca\/database\/profiles\/empire-communities\" target=\"_blank\" rel=\"noopener noreferrer\">Empire Communities<\/a>, will feature towers of 49 and 66 storeys, with the taller one rising to 228 metres, just 5 metres shorter than the easterly\u00a0<a href=\"http:\/\/urbantoronto.ca\/link.php?source=database&amp;url=urbantoronto.ca\/database\/projects\/sun-life-financial-tower-harbour-plaza-residences\" target=\"_blank\" rel=\"noopener noreferrer\">Harbour Plaza Residences<\/a> tower in Toronto&#8217;s South Core, making Eau du Soleil the second tallest building currently under construction in the city which has not already topped off.<\/p>\n<p><div style=\"width: 650px\" class=\"wp-caption alignnone\"><a class=\"lightbox-processed\" href=\"http:\/\/urbantoronto.ca\/sites\/default\/files\/imagecache\/display-slideshow\/images\/articles\/2016\/04\/20690\/20690-70870.jpg\" rel=\"lightbox[group1][Looking northwest across the Eau du Soleil excavation pit, image by Craig Whitea ]\"><img loading=\"lazy\" title=\"Looking northwest across the Eau du Soleil excavation pit, image by Craig Whitea\" src=\"http:\/\/urbantoronto.ca\/sites\/default\/files\/imagecache\/display-default\/images\/articles\/2016\/04\/20690\/20690-70870.jpg\" alt=\"Construction is under way for Eau du Soleil, an Empire Communities condo complex\" width=\"640\" height=\"427\" \/><\/a><p class=\"wp-caption-text\">Looking northwest across the Eau du Soleil excavation pit, image by Craig White<\/p><\/div>The excavation pit for the development is a large rectangle, about 4 acres in area, located to the immediate southwest of the <a href=\"http:\/\/urbantoronto.ca\/link.php?source=database&amp;url=urbantoronto.ca\/database\/projects\/jade-waterfront\" target=\"_blank\" rel=\"noopener noreferrer\">Jade Waterfront Condominiums<\/a> seen at right in the image above. At ground level, Eau du Soleil is\u00a0u-shaped, and separated from Jade Waterfront by a street. Above the six-storey podium, Eau du Soleil&#8217;s towers rise out of terraced lower floors, the design by\u00a0<a href=\"http:\/\/urbantoronto.ca\/database\/profiles\/zeidler-partnership-architects\" target=\"_blank\" rel=\"noopener noreferrer\">Zeidler Partnership Architects<\/a>\u00a0and\u00a0<a href=\"http:\/\/urbantoronto.ca\/database\/profiles\/richmond-architects\" target=\"_blank\" rel=\"noopener noreferrer\">Richmond Architects<\/a>\u00a0meant to evoke the feel of cruise ships.<\/p>\n<p><div style=\"width: 650px\" class=\"wp-caption alignnone\"><a class=\"lightbox-processed\" href=\"http:\/\/urbantoronto.ca\/sites\/default\/files\/imagecache\/display-slideshow\/images\/articles\/2016\/04\/20690\/20690-70871.jpg\" rel=\"lightbox[group1][Garage floor poured at the Eau du Soleil construction site, image by Craig Whitea ]\"><img loading=\"lazy\" title=\"Garage floor poured at the Eau du Soleil construction site, image by Craig Whitea\" src=\"http:\/\/urbantoronto.ca\/sites\/default\/files\/imagecache\/display-default\/images\/articles\/2016\/04\/20690\/20690-70871.jpg\" alt=\"Construction is under way for Eau du Soleil, an Empire Communities condo complex\" width=\"640\" height=\"427\" \/><\/a><p class=\"wp-caption-text\">Garage floor poured at the Eau du Soleil construction site, image by Craig White<\/p><\/div>The site can currently be read as four quadrants, each one with successively more completed than the quadrant to its side. Furthest along is the northwest corner where the second garage level has been poured and where several columns to hold up the next floor are already in place. To its right, the wooden forms where the concrete floor will next be poured can be seen. At the back the image below (click on it or any image to see it in greater detail), workers are placing the steel rebar mesh that will give the concrete slab its strength.<\/p>\n<p><div style=\"width: 650px\" class=\"wp-caption alignnone\"><a class=\"lightbox-processed\" href=\"http:\/\/urbantoronto.ca\/sites\/default\/files\/imagecache\/display-slideshow\/images\/articles\/2016\/04\/20690\/20690-70872.jpg\" rel=\"lightbox[group1][Garage floor forms at the Eau du Soleil construction site, image by Craig Whitea ]\"><img loading=\"lazy\" title=\"Garage floor forms at the Eau du Soleil construction site, image by Craig Whitea\" src=\"http:\/\/urbantoronto.ca\/sites\/default\/files\/imagecache\/display-default\/images\/articles\/2016\/04\/20690\/20690-70872.jpg\" alt=\"Construction is under way for Eau du Soleil, an Empire Communities condo complex\" width=\"640\" height=\"427\" \/><\/a><p class=\"wp-caption-text\">Garage floor forms at the Eau du Soleil construction site, image by Craig White.<\/p><\/div>To the right of the wooden forms, the walls, columns, and slab of the lowest level of the garage can be seen.<\/p>\n<p><div style=\"width: 650px\" class=\"wp-caption alignnone\"><a class=\"lightbox-processed\" href=\"http:\/\/urbantoronto.ca\/sites\/default\/files\/imagecache\/display-slideshow\/images\/articles\/2016\/04\/20690\/20690-70873.jpg\" rel=\"lightbox[group1][Garage floor columns at the Eau du Soleil construction site, image by Craig Whitea ]\"><img loading=\"lazy\" title=\"Garage floor columns at the Eau du Soleil construction site, image by Craig Whitea\" src=\"http:\/\/urbantoronto.ca\/sites\/default\/files\/imagecache\/display-default\/images\/articles\/2016\/04\/20690\/20690-70873.jpg\" alt=\"Construction is under way for Eau du Soleil, an Empire Communities condo complex\" width=\"640\" height=\"427\" \/><\/a><p class=\"wp-caption-text\">Garage floor columns at the Eau du Soleil construction site, image by Craig White.<\/p><\/div>In the southeast and furthest quadrant of the site from the camera\u2014beyond where the lowest level of columns have been erected\u2014three shovels break up rock and move it in steps to the surface, where it is then trucked away.<\/p>\n<p><iframe loading=\"lazy\" width=\"1080\" height=\"608\" src=\"https:\/\/www.youtube.com\/embed\/ZsPEhT3j-5g?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><\/p>\n<p>Once the excavation has been completed in the southeast quadrant, a fourth and last tower crane will be installed, promising to add to the cranes&#8217; aerial ballet seen in the video above.<\/p>\n<p>Completion of this huge development is still a couple transits of the sun away. In the meantime, if you want to know what Eau du Soleil will look like when built, check out our dataBase file, linked below, for plenty of renderings and lots of facts and figures. What to talk about the development? Choose one of the associated Forum thread links to get in on the conversation, or leave a comment in the space provided on this page.<\/p>\n<p>by<a href=\"http:\/\/urbantoronto.ca\/news\/2016\/04\/construction-full-swing-eau-du-soleil-etobicoke\" target=\"_blank\" rel=\"noopener noreferrer\"> <span class=\"article-author\">Craig White<\/span><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>One of the largest excavation pits in the Greater Toronto Area is now buzzing with activity as work is under way to build two condominium towers\u2014one of them the tallest building in Canada outside of a downtown area\u2014and the sweeping podium they will rise from. Eau du Soleil,\u00a0being developed by Empire Communities, will feature towers [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1442,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[2,3,5],"tags":[228],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction In Full Swing at Canada&#039;s tallest building outside of a downtown area - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction In Full Swing at Canada&#039;s tallest building outside of a downtown area - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"One of the largest excavation pits in the Greater Toronto Area is now buzzing with activity as work is under way to build two condominium towers\u2014one of them the tallest building in Canada outside of a downtown area\u2014and the sweeping podium they will rise from. Eau du Soleil,\u00a0being developed by Empire Communities, will feature towers [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2016-04-25T14:56:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/20690-70874.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"640\" \/>\n\t<meta property=\"og:image:height\" content=\"360\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/20690-70874.jpg\",\"width\":640,\"height\":360,\"caption\":\"A shovel drops earth into a truck at the Eau du Soleil construction site, image by Craig Whitea\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/\",\"name\":\"Construction In Full Swing at Canada's tallest building outside of a downtown area - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/#primaryimage\"},\"datePublished\":\"2016-04-25T14:56:12+00:00\",\"dateModified\":\"2016-04-25T14:56:12+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"Construction In Full Swing at Canada&#8217;s tallest building outside of a downtown area\",\"datePublished\":\"2016-04-25T14:56:12+00:00\",\"dateModified\":\"2016-04-25T14:56:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/construction-in-full-swing-at-canadas-tallest-building-outside-of-a-downtown-area\/#primaryimage\"},\"keywords\":\"Canada Construction\",\"articleSection\":\"Constuction &amp; Business News,Crane &amp; Lifting News,Equipment &amp; Construction Videos\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/1441"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=1441"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/1441\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/1442"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=1441"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=1441"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=1441"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}