{"id":12081,"date":"2017-10-10T23:21:54","date_gmt":"2017-10-10T23:21:54","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=12081"},"modified":"2017-10-10T23:21:54","modified_gmt":"2017-10-10T23:21:54","slug":"tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/","title":{"rendered":"Tutt Bryant\u2019s Manitowoc MLC650 crawler crane assembles tunnel boring machines on a Australian infrastructure project"},"content":{"rendered":"<p>The Forrestfield-Airport Link will be a new subway system linking downtown Perth with the Western Australian city\u2019s airport. <a href=\"http:\/\/www.tuttbryant.com.au\/tutt-bryant-group\/heavy-lift--shift.html\" target=\"_blank\" rel=\"noopener noreferrer\">Tutt Bryant Heavy Lift &amp; Shift<\/a> provided the lifting power to build one of the Tunnel Boring Machine (TBM) units, and sent its 650 t capacity Manitowoc MLC650 to handle the task.<\/p>\n<p>The AU$1.86 billion Forrestfield-Airport Link is the government\u2019s latest effort to strengthen public transport in Perth and improve access between the city and its airport. Central to construction of the underground rail system are the TBM units, which each weigh over 160 t and measure 7 m in diameter. They arrived at Forrestfield by truck, which is where the MLC650 was used to assemble and lift into position one of the units. It is currently working on an 8 km stretch of the tunnel that will link Perth\u2019s foothills with the city\u2019s downtown area. Drilling began in July and is expected to last two years.<\/p>\n<p>\u201cThe Manitowoc MLC650 made assembly of this giant TBM seem easy and effortless,\u201d said David Taylor, business development manager at Tutt Bryant. \u201cThe crane\u2019s unique VPC gave us ample lift ability, positioning the counterweight automatically and offering unmatched versatility.\u201d<\/p>\n<p>Manitowoc\u2019s unique VPC system automatically positions the counterweight to fit the required lift. The counterweight moves along the rotating bed and is positioned based on changes in boom angle and lift load. Advantages for customers include reduced ground preparation, lower ground-bearing pressure, and less counterweight, without sacrificing capacity.<\/p>\n<p>Employing one of the largest crane fleets in Australia, Tutt Bryant Heavy Lift &amp; Shift currently operates over 150 units, including pick-and-carry, rough-terrain cranes, truck-mounted cranes, all-terrain and crawler cranes.<\/p>\n<div id=\"attachment_12083\" style=\"width: 3857px\" class=\"wp-caption alignnone\"><img aria-describedby=\"caption-attachment-12083\" loading=\"lazy\" class=\"size-full wp-image-12083\" src=\"https:\/\/cranemarket.com\/blog\/wp-content\/uploads\/2017\/10\/Tutt-Byrant-Crawler-and-All-Terrain-Cran.jpg\" alt=\"The Forrestfield-Airport Link will be a new subway system linking downtown Perth with the Western Australian city\u2019s airport. Tutt Bryant Heavy Lift &amp; Shift provided the lifting power to build one of the Tunnel Boring Machine (TBM) units, and sent its 650 t capacity Manitowoc MLC650 to handle the task.\" width=\"3847\" height=\"2902\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/10\/Tutt-Byrant-Crawler-and-All-Terrain-Cran.jpg 3847w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/10\/Tutt-Byrant-Crawler-and-All-Terrain-Cran-300x226.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/10\/Tutt-Byrant-Crawler-and-All-Terrain-Cran-768x579.jpg 768w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/10\/Tutt-Byrant-Crawler-and-All-Terrain-Cran-1024x772.jpg 1024w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/10\/Tutt-Byrant-Crawler-and-All-Terrain-Cran-1080x815.jpg 1080w\" sizes=\"(max-width: 3847px) 100vw, 3847px\" \/><p id=\"caption-attachment-12083\" class=\"wp-caption-text\">The Forrestfield-Airport Link will be a new subway system linking downtown Perth with the Western Australian city\u2019s airport. Tutt Bryant Heavy Lift &amp; Shift provided the lifting power to build one of the Tunnel Boring Machine (TBM) units, and sent its 650 t capacity Manitowoc MLC650 to handle the task.<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Forrestfield-Airport Link will be a new subway system linking downtown Perth with the Western Australian city\u2019s airport. Tutt Bryant Heavy Lift &amp; Shift provided the lifting power to build one of the Tunnel Boring Machine (TBM) units, and sent its 650 t capacity Manitowoc MLC650 to handle the task. The AU$1.86 billion Forrestfield-Airport Link [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12086,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[3,8],"tags":[1018,1562],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Tutt Bryant\u2019s Manitowoc MLC650 crawler crane assembles tunnel boring machines on a Australian infrastructure project - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tutt Bryant\u2019s Manitowoc MLC650 crawler crane assembles tunnel boring machines on a Australian infrastructure project - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"The Forrestfield-Airport Link will be a new subway system linking downtown Perth with the Western Australian city\u2019s airport. Tutt Bryant Heavy Lift &amp; Shift provided the lifting power to build one of the Tunnel Boring Machine (TBM) units, and sent its 650 t capacity Manitowoc MLC650 to handle the task. The AU$1.86 billion Forrestfield-Airport Link [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2017-10-10T23:21:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/10\/Tutt-Bryant-MLC_Manitowoc-Crawler-Crane.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"4032\" \/>\n\t<meta property=\"og:image:height\" content=\"2264\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2017\/10\/Tutt-Bryant-MLC_Manitowoc-Crawler-Crane.jpg\",\"width\":4032,\"height\":2264,\"caption\":\"The Forrestfield-Airport Link will be a new subway system linking downtown Perth with the Western Australian city\\u2019s airport. Tutt Bryant Heavy Lift &amp; Shift provided the lifting power to build one of the Tunnel Boring Machine (TBM) units, and sent its 650 t capacity Manitowoc MLC650 to handle the task.\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/\",\"name\":\"Tutt Bryant\\u2019s Manitowoc MLC650 crawler crane assembles tunnel boring machines on a Australian infrastructure project - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/#primaryimage\"},\"datePublished\":\"2017-10-10T23:21:54+00:00\",\"dateModified\":\"2017-10-10T23:21:54+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"Tutt Bryant\\u2019s Manitowoc MLC650 crawler crane assembles tunnel boring machines on a Australian infrastructure project\",\"datePublished\":\"2017-10-10T23:21:54+00:00\",\"dateModified\":\"2017-10-10T23:21:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/tutt-bryants-manitowoc-mlc650-crawler-craneassembling-tunnel-boring-machines-on-australian-infrastructure-project\/#primaryimage\"},\"keywords\":\"Manitowoc MLC650,tutt bryant\",\"articleSection\":\"Crane &amp; Lifting News,Manufacturer News\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/12081"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=12081"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/12081\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/12086"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=12081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=12081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=12081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}