{"id":1013,"date":"2016-04-20T18:11:48","date_gmt":"2016-04-20T18:11:48","guid":{"rendered":"http:\/\/minutes.machine.market\/?p=1013"},"modified":"2016-04-20T18:11:48","modified_gmt":"2016-04-20T18:11:48","slug":"mit-nano-rising","status":"publish","type":"post","link":"https:\/\/machine.market\/blog\/mit-nano-rising\/","title":{"rendered":"MIT.nano building rising"},"content":{"rendered":"<p>A spectacular show has been going on outside the windows of central-campus buildings all spring. An enormous steel structure has been growing \u2014 piece by piece, and bolt by bolt \u2014 out of a giant hole in the ground formerly occupied by Building 12. At a March 24 \u201ctool talk\u201d information session for the MIT community on the construction of MIT.nano, representatives from MIT Facilities and the contractors who are building the new 200,000 square foot nanoscale characterization and fabrication facility gave an overview not only of where things stand with the project, but how they got stood up.<\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-1016 alignright\" src=\"http:\/\/minutes.machine.market\/wp-content\/uploads\/2016\/04\/MITnano_steel4-1-300x200.jpg\" alt=\"MITnano_steel4 (1)\" width=\"300\" height=\"200\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/MITnano_steel4-1-300x200.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/MITnano_steel4-1.jpg 639w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>\u201cIn our structural-steel erection progress log, we\u2019ve been averaging around 23 tons per day,\u201d said Peter Johnson of Turner Construction. \u201cWe\u2019re putting up 2,101 tons total, and we\u2019re 22 percent complete.\u201d<\/p>\n<p>On day 469 of the 1,000 days of construction for the project, about 75 percent of the first level was complete, and a quarter of the level 3 cleanroom was installed down to the floor decking. The framing for the entire structure, which will reach a final height of 90 feet above grade, is scheduled to be complete by late May. To get there, Johnson and others have spent years organizing and refining a minutely detailed project plan that links engineering design and fabrication, and the installation process. They have had to map out construction logistics on an hour-to-hour, and foot-by-foot basis. It all must be calibrated to unfold within specific timelines and within the tight confines of MIT.nano\u2019s central campus location. \u201cThere\u2019s not a lot of space when it comes to material handling and the movement of workers,\u201d Johnson noted.<\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-1017 alignleft\" src=\"http:\/\/minutes.machine.market\/wp-content\/uploads\/2016\/04\/MIT-nano-steel-1_0-300x200.jpeg\" alt=\"MIT-nano-steel-1_0\" width=\"300\" height=\"200\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/MIT-nano-steel-1_0-300x200.jpeg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/MIT-nano-steel-1_0.jpeg 639w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Decisions about cranes, Johnson said, were particularly critical. \u201cWhile we could have used a single crane to reach the entire footprint, it was too slow. We have a several thousand line item project schedule with hundreds of steel-related tasks,\u201d Johnson explained. \u201cSo having two cranes for a shorter period of time made the job more efficient.\u201d<\/p>\n<p>The first crane was erected during the excavation phase, so workers could use it to lower concrete and rebar into the excavated hole for elements of the foundation. The next crane arrived just prior to steel installation. Positioned strategically in locations that do not block truck routes, the cranes hoist pre-fabricated, specially packaged bundles of steel into the specific locations where they will be needed for construction. Within these packages, each piece has a number that corresponds to its function and placement, and each one has been specifically manufactured for its location, with features like pre-drilled holes to accommodate plumbing and electrical connections. (\u201cSo someone knows where the number goes, and that side A connects to side B?\u201d asked Vladimir Bulovic, the faculty lead on the design and construction of MIT.nano. \u201cJust like my Ikea furniture, but bigger.\u201d The construction experts did not dismiss the comparison.)<\/p>\n<p><img loading=\"lazy\" class=\"size-medium wp-image-1015 alignright\" src=\"http:\/\/minutes.machine.market\/wp-content\/uploads\/2016\/04\/MITnano_steel3-300x200.jpg\" alt=\"MITnano_steel3\" width=\"300\" height=\"200\" srcset=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/MITnano_steel3-300x200.jpg 300w, https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/MITnano_steel3.jpg 639w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Working with Ontario-based steel fabricator, Canatal, Johnson and his colleagues at Turner developed a four-dimensional plan for steel engineering, delivery, and installation. \u201cWe went through a painstaking process to maximize efficiency of this sequence,\u201d says Johnson. \u201cThis allows us to avoid times when a crane is down because it\u2019s waiting\u201d for a delivery of steel.<\/p>\n<p>As the structure grows, engineers continuously monitor the basement walls and foundation of the structure with inclinometers, a seismograph, and a three-dimensional laser scanner to gauge how they are responding to the additional weight of the steel. The corner braces in the building\u2019s 50-foot-deep excavation that counteract pressure coming from outside the walls will be removed after the steel is finished and concrete is poured on the building\u2019s first floor. \u201cThe building is performing the way we expected it to,\u201d said Richard Amster, director of campus construction.<\/p>\n<p>Leda Zimmerman | <a href=\"http:\/\/news.mit.edu\/2016\/mit-nano-rising-0420\" target=\"_blank\" rel=\"noopener noreferrer\">School of Engineering <\/a><br \/>\nApril 20, 2016<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A spectacular show has been going on outside the windows of central-campus buildings all spring. An enormous steel structure has been growing \u2014 piece by piece, and bolt by bolt \u2014 out of a giant hole in the ground formerly occupied by Building 12. At a March 24 \u201ctool talk\u201d information session for the MIT [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1014,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":""},"categories":[2,3],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v14.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>MIT.nano building rising - MachineMarket Blog<\/title>\n<meta name=\"robots\" content=\"index, follow\" \/>\n<meta name=\"googlebot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta name=\"bingbot\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MIT.nano building rising - MachineMarket Blog\" \/>\n<meta property=\"og:description\" content=\"A spectacular show has been going on outside the windows of central-campus buildings all spring. An enormous steel structure has been growing \u2014 piece by piece, and bolt by bolt \u2014 out of a giant hole in the ground formerly occupied by Building 12. At a March 24 \u201ctool talk\u201d information session for the MIT [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/\" \/>\n<meta property=\"og:site_name\" content=\"MachineMarket Blog\" \/>\n<meta property=\"article:published_time\" content=\"2016-04-20T18:11:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/MITnano_steel2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"639\" \/>\n\t<meta property=\"og:image:height\" content=\"426\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/machine.market\/blog\/#organization\",\"name\":\"CraneMarket | Cranes for Sale and Rent\",\"url\":\"https:\/\/machine.market\/blog\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2019\/03\/crane-market-logo.png\",\"width\":282,\"height\":81,\"caption\":\"CraneMarket | Cranes for Sale and Rent\"},\"image\":{\"@id\":\"https:\/\/machine.market\/blog\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/machine.market\/blog\/#website\",\"url\":\"https:\/\/machine.market\/blog\/\",\"name\":\"MachineMarket Blog\",\"description\":\"Machine News\",\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"https:\/\/machine.market\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/machine.market\/blog\/wp-content\/uploads\/2016\/04\/MITnano_steel2.jpg\",\"width\":639,\"height\":426},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/#webpage\",\"url\":\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/\",\"name\":\"MIT.nano building rising - MachineMarket Blog\",\"isPartOf\":{\"@id\":\"https:\/\/machine.market\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/#primaryimage\"},\"datePublished\":\"2016-04-20T18:11:48+00:00\",\"dateModified\":\"2016-04-20T18:11:48+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/\"]}]},{\"@type\":\"Article\",\"@id\":\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/#webpage\"},\"author\":{\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\"},\"headline\":\"MIT.nano building rising\",\"datePublished\":\"2016-04-20T18:11:48+00:00\",\"dateModified\":\"2016-04-20T18:11:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/#webpage\"},\"publisher\":{\"@id\":\"https:\/\/machine.market\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/cranemarket.com\/blog\/mit-nano-rising\/#primaryimage\"},\"articleSection\":\"Constuction &amp; Business News,Crane &amp; Lifting News\",\"inLanguage\":\"en-US\"},{\"@type\":[\"Person\"],\"@id\":\"https:\/\/machine.market\/blog\/#\/schema\/person\/d55314291bc2800387533231d1e82150\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/machine.market\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/6761c958e8b054582d0855a0e4bc5407?s=96&d=mm&r=g\",\"caption\":\"admin\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/1013"}],"collection":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/comments?post=1013"}],"version-history":[{"count":0,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/posts\/1013\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media\/1014"}],"wp:attachment":[{"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/media?parent=1013"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/categories?post=1013"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/machine.market\/blog\/wp-json\/wp\/v2\/tags?post=1013"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}